<h4>Subsection 9.2: Required Utilities (Div. 7.7.)</h4> <ul> <li>Water (required): Connection to public supply, installation of central supply, or evidence of individual well is required.</li> <li>Sewer (required): </li> <li>If the property is 0-500 feet from public sanitary sewer, connection to public sanitary sewer is required.</li> <li>If the property is more than 500 feet from public sanitary sewer, a small wastewater (septic) facility is required.</li> </ul>
This section details the requirements for utilities, including water and sewer connections, under the land use code.