BuildLimit
Login

Note: 120

Linked Document

Created:
Type: None
Source URL: link
Text:

<h4>Institutional and Infrastructure Uses 2c: Maximum Intensity of Use</h4> <ul> <li>The intensity of the use is limited to maintain the rural character of the area and the State or County road from which access is taken.</li> <li>If the proposed use is continuous, the intensity is limited by restricting the maximum occupancy.</li> <li>If the proposed use involves discrete occurrences, the intensity is limited by restricting the frequency of occurrence.</li> <li>The Board may impose conditions based on one or both of the standards: maximum occupancy and frequency.</li> <li>The Board may also limit a use to a particular season or time period based on an Environmental Analysis.</li> <li>Proposed outdoor or temporary storage or use areas are evaluated as part of the CUP process, and conditions may be imposed to minimize impacts.</li> </ul>

Context:

This section outlines how the intensity of use is regulated, including restrictions on maximum occupancy, frequency of occurrence, and seasonal limitations.