<h3>Top of Bank</h3> <p>The elevation of the top of bank shall be determined by the observed high water mark, or one foot above the maximum discharge elevation of an outlet control structure that controls the water elevation of a body of water.</p>
This section defines the term "Top of Bank" as it relates to land use and development.