<h3>Infrastructure - Required Utilities</h3> <ul> <li>Water: Connection to public supply, installation of central supply, or evidence of individual well is required.</li> <li>Sewer: Connection to a public sanitary sewer is required within 500 feet. If this is not possible, Small Wastewater Facility (septic) approval is required.</li> </ul>
This section details the requirements for utilities, specifically water and sewer connections, in the infrastructure code.